Name of the Contract

Client

Work

Nos of Structure

Rs. (Crore)

% Work Completed

Four Laning of Punjab/Haryana Border-Jind Section of NH-71 from Km. 238.695 to Km. 307.00 under NHDP Phase-IVB in the State of Haryana on EPC mode

M/s Dineshchandra
R. Agrawal Infracon Pvt.  td.

Bridge Work

1 No- ROB. 4 Nos-Flyover 4 Nos-LVUP

20 Crs

100%

Widening and Rehabilitation of Existing Patiala Bypass Road Km 50+000 to 69+250 on NH
64 in the State of Punjab on EPC Mode under NHDP-IV

M/s Dineshchandra
R. Agrawal Infracon Pvt. Ltd.- SBIPL (JV)

Bridge Work

2 Nos-Flyover 4 Nos-LVUP 6 Nos PUP 10 Box Cul

10Crs

100%

Construction of Two Lane ROB in lieu of Level crossing No 11 at IR chainage 14/2- 3 between Khori and Pali Station on Rewari- Phulera Section of Jaipur Division of NWR

Maan-Rana (JV)

Road Work& ROB& RE wall

1 No- ROB 14 Span , RE Wall and Road Work

22.50 Crs

100%

Construction of Six-Lane access controlled highway (NH-152D) starting From Ismailabad on NH-152 to Junction with Karnal – Pehowe Road (SH-9) near  hand(Km. 00+000 to Km. 23+000 Length 23 Km.) under Bharatmala Pariyojana in the State of Haryana on EPC mode.

Celgal Pvt Ltd-Shiv Buildindia Pvt Ltd (JV)

Bridge Work

3 Nos- LVUP 4 Nos-SVUP 2 Nos -MJB 10 Nos- Box.

05 Crs

100%

Construction of Six-Lane access-controlled highway (NH-152D) starting from Junction with Jind-Safidon Road (SH-14) near Kheri village to Junction with NH-352 (Jind-Gohana Section) near Julana (Km. 80+000 to Km.108+000 Length 28 Km.) under Bharatmala Pariyojana in the State of Haryana on EPC mode.

Shiv Buildindia Pvt Ltd

Bridge Work

1No-ROB 2 Nos- LVUP 2 Nos-
SVUP 3 Nos -MJB 10 Nos- Box
Culvert

20 Crs

100%

Construction of Six-Lane access-controlled highway (NH-152D) starting from Junction with Jind-Safidon Road (SH-14) near Kheri village to Junction with NH-352 (Jind-Gohana Section) near Julana (Km. 132+000 to Km.160+000 Length 28 Km.) under Bharatmala Pariyojana in the State of HR

Gawar Construction LTD

Bridge Work

1No-ROB 3Nos Flyover 5 Nos- LVUP 5 Nos-SVUP 4 Nos -MJB
10 Nos- Box Culvert

15 Crs

100%

Four Laining of Dewas Ujjain Section of Old SH18 from Design Ch. 0+000 to 19+733, Construction of Four Lane Ujjain Bypass from Design Ch. 19+733 to Ch. 26+900 (Part-I) and Construction of Four Lane Dewas Bypass from Design Ch. 0+000 to Ch. 14+520 (Part-II) having total Design Length 41.42 KM in the state of MPon HAM Mode.

Dhariwal Buildtech Limited

Bridge Work

1No- ROB 9 Nos Flyover
8 Nos-LVUP 6 Nos-SVUP 6 Nos-MJB 80 Nos Box Culvert

40 Crs

100%

Construction of Four Laining of Rajauli to Bakhtiyarpur Section (Package-III) NH-20 State of BR

Gawar Construction LTD

Bridge Work

2.5 KM Flyover & MNB

45 Crs

100%

Construction of Six Laining of Flyover Raha, Demow, Borghat and ROB NH-36 and NH-37 State of Assam EPC Mode

Dhariwal Buildtech Limited

Bridge Work

Road Work and ROB

70 Crs

100%

Development of six lane access control greenfield highway of Delhi-Saharanpur- Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 0+000(Akshardham NH-9 (old NH-24) to Design Chainage 14+750 (Delhi/UP border) in the state of Delhi (Package-1) on EPC mode.

Gawar Construction LTD

Bridge Work

Elevated Structure

30 Crs

100%

Project: - Two/Four Laning of Brt Tiger Reserve Boundary to Bangalore Section Of NH-209 (Existing Chainage from Km. 287+520 To Km 461+550) in the State of Karnataka on Hybrid Annuity Mode Under NHDP Phase-IV.

Gawar Construction LTD

All Civil Work

Road Work and Bridges

110 Crs

100%

Four laning of Bhiwani – Hansi Road section of NH – 148B (Design length 42.934 Km) under Bharatmala Pariyojana in the State of Haryana on Hybrid Annuity Mode (HAM)

Gawar Construction LTD

All Civil Work

Road Work and Bridges

75 Crs

Work In Progress

Four Laning of NH-119 from Behsuma at km 39.250 (Ex. Km 39+240 to Bijnor at km 78.810 (Ex. Km 86+590) (Design Length=39.560Km) in the state of Uttar Pradesh on Hybrid Annuity Mode

Gawar Construction LTD

Bridge Work

MJB, MNB and Underpasses

20 Crs

Work In Progress